Rapid-hardening concrete
Third-generation rapid-hardening concrete reaching 20 N/mm² in 1–2 hours, with adjustable open time. Produced at a concrete plant; placed by hand, pump or paver. For large runway and road repairs.
Concrete repair systems that set within hours and reopen to traffic quickly — preferred for airport runways and roads where closure time is critical.

High-strength concrete repair materials that cure within hours — minimizing runway and road closure time. Fabtecon is the address for Concretum products in Turkey, providing supply and field application for airport runways and roads.
Figures as declared by Concretum; see the data sheets for details.

Third-generation rapid-hardening concrete reaching 20 N/mm² in 1–2 hours, with adjustable open time. Produced at a concrete plant; placed by hand, pump or paver. For large runway and road repairs.
When extreme speed is not required but progress must stay fast: 20 N/mm² in 5 hours with a longer open time. The economical choice for large volumes.
Bagged repair concrete reaching 20 N/mm² in 2 hours. For small and medium slab replacements and road and runway repairs.
20 N/mm² in 1 hour. For thin layers, small edge breakages, joint renovation and sloping surfaces.
Rapid-hardening mortar for 3–5 cm fills and voids; 20 N/mm² in 3 hours.

To pick the right product for your closure window and volume.
| Product | 20 N/mm² | Open time | Layer thickness | Minimum quantity |
|---|---|---|---|---|
| Q-FLASH 2/20 | 1–2 hours | 60–120 min, adjustable | > 15 cm | 50 m³ |
| Q-FLASH 5/20 | 5 hours | 90–180 min, adjustable | > 15 cm | 150 m³ |
| Q-CON | 2 hours | 40–90 min | > 10 cm | 2 pallets (~1 m³) |
| Q-REP G | 1 hour | 15–30 min | > 5 cm | 2 pallets (~1 m³) |
| Q-FILL | 3 hours | 15–30 min | 3–5 cm | 2 pallets (~1 m³) |
Open times depend on temperature. Q-FLASH is produced at a concrete plant.
No special machinery or procedures — it works with existing plants and equipment.
Product and open time are chosen to suit the closure window and volume.
Q-FLASH is produced at a local concrete plant, mobile mixer or truck mixer; dry mixes are mixed on site.
By hand, pump or paver. Consistency can be paver-stable, pumpable or self-compacting (SCC).
With Q-FLASH 2/20 the surface is fully load-bearing within 1–2 hours.

Selected projects using Concretum products abroad.

Send us your project details and technical requirements; our team will recommend the right products.